A PGM group smelter faced challenges with premature termination failures, leading to unplanned downtime and production losses. Martec implemented IIoT real-time condition monitoring to identify and predict risks, reducing failures and ensuring a more reliable and safe electrical system.

Like what you see? Sign up to share your own knowledge, like posts, and engage with the community!

Client Background

Our client operates a PGM group smelter situated outside of Polokwane.

The current infrastructure comprises a 68MW furnace fed by 33kV single-core cables. The concentrate is melted by energy generated when an electric current passes through the electrodes and resistive slag layer. On melting, two immiscible phases form: slag and matte. The furnace matte, containing the bulk of the base metal sulphides and PGMs, is denser than slag and collects naturally at the bottom of the furnace.

Electricity is the single most significant input cost for smelting platinum concentrate in the electric furnace and, therefore, must have a reliable power supply. This requires that all the electrical assets are available 100% of the time and that these are monitored 24/7 to ensure reliability.

Key Challenges

Premature failure of terminations: The challenge was to identify the defect using IIoT realtime condition monitoring and predict how big the risk of failure was. Not identifying this will lead to termination failure, which will lead to unplanned downtime and loss of production time.

Investigation during shutdown: The next challenge was being under pressure to do this investigation as thoroughly and quickly as possible while staying safe. Strict isolation and lockout procedures were implemented to open up panels identified for the investigation.

Eliminating costly failures: Not only is a failure costly to repair, but it leads to unwanted and costly downtime. An unwanted failure can lead to significant production losses, especially on this plant, where a repair can take from three days up to a week, creating massive losses.

Martec Intervention

“Intime” condition monitoring proved itself to be very effective in preventing catastrophic failure.

We use the process to the right to implement a monitoring solution to ensure failures are “seen” before they occur.

Assets are ranked from a level 1 – 5.

Value Add

- Reducing risk of failure
- Ensuring more reliable plant
- Restoration of a safe electrical system
- Ensuring safe working conditions within substations
- Saving millions in unwanted production losses

Tools and Technology used
- IIoT Realtime Partial Discharge Monitoring
- Visual inspections
- Investigations

Additional Images
Post Information
Category: Motor Current/Magnetic Flux Signature Case Study
Language: English
Reading Time: 2 min
Tags
partial discharge iiot
Original Authors
Martec
Shared By
Reliability

Login to view profile

Join Our Community

Sign up to share knowledge, engage with posts, and connect with experts.

Sign Up